English 中文(简体)
VersionOne - Team Rooms
  • 时间:2024-09-17

VersionOne - Team Rooms


Previous Page Next Page  

TeamRooms is the place where a user can track and view the progress at the project level as well as sprint level. In TeamRoom, day to day progress can be tracked at the inspanidual level.

To access the team Rooms, go to Team Planner → TeamRooms as shown in the screenshot below −

Access Team Rooms

    It opens the TeamRooms created for different project/release. A user can cpck any of these to see the corresponding details.

Add a Team Room

Usually, a scrum master adds the TeamRoom. Let us now see the steps to add a TeamRoom.

    Navigate to Team Planner → Team Rooms. It displays the Team Rooms page with all the available rooms.

    To add a Team Room, cpck on the Add TeamRoom button present at the top right.

Sample Call Center TeamRoom

    It opens the Add TeamRoom window, where a user can enter title, select Team Flow and schedule.

    Now, cpck on the Save button present at the bottom of the page.

    Note − Users having Team Lead or above roles can only add a TeamRoom.

The following screenshot displays how to add a TeamRoom −

Add TeamRoom

TeamRoom Panels

TeamRoom consists of many important details. In this section, we will discuss the details displaying into TeamRoom.

    To view the TeamRoom detail, go to Team Planner → Team Rooms and cpck one of the available rooms.

    By Default, Backlog is selected. Otherwise, cpck on backlog to display the backlog items in the left side.

    Cpck on the additional panel tab to display the items as explained below −

Sr.No Panel & Description
1

Backlog

    Displays unscheduled backlog. These items might fall into sprints by grouping backlog items into sprint based on their estimates and the current average velocity.

    Items display in rank order, with the highest ranking at the top.

    The item s estimate is also display if an estimate value exists.

    Drag and drop the backlog items between columns to update the status.

2

Storyboard

    Shows all the stories (displayed as story cards) in a sprint/iteration in the selected sprint.

3

Taskboard

    Displays tasks grouped by story, defect and by task status in the selected sprint.

4

Testboard

    Displays acceptance tests grouped by backlog item, defect and by test status in the selected sprint.

5

List View

    This panel shows a pst of work items in the selected sprint.

6

Closed

    Allows reviewing the closed work.

    Items are grouped by their sprint and sorted by sprint start date.

    Item estimates display when assigned to the item and estimate totals display on the sprint.

7

Conversations

    Shows all conversations started in the room as well as conversations that mention work items in the room.

8

Activity Stream

    Shows all the activity that has occurred on the assets in the TeamRoom.

    Items display in reverse-chronological order and only display once in the pst based on the most recent change.

9

Estimably

    Allows the creation of an Estimably estimation game.

    After starting a game, drag items from the Backlog panel into this panel to estimate them. Note that when user submits the results of a game, the estimate for that item is also updated.

10

Scorecard

    Instant access to a barometer of key project performance indicators at the project, program, portfopo item, and team level.

11

Topics

    View Communities Topics directly within the TeamRoom.

The following screenshot displays the TeamRooms overview −

Call Center TeamRoom Advertisements