English 中文(简体)
SAP CCA - Planning
  • 时间:2024-11-03

SAP CCA - Planning


Previous Page Next Page  

In SAP system, Cost Center Planning is used to maintain figures for cost, prices and key figures for cost center in defined period of planning. It is a part of business planning process and is required for standard costing.

You perform Cost Center planning to achieve following functions −

    To Plan the structure

    To control and monitor business growth

    To perform target comparison-plan/actual or target/actual

    Cost center planning covers following planning area

    Cost Element

    Primary Cost

    Secondary Cost

    Revenue

    Activity Type

    Statistical Key Figures

To see details about Cost Center planning in SAP system −

Step 1 − Navigate to SPRO → IMG → Controlpng → Cost Center Accounting → Planning → Manual Planning → User Defined Planning Layouts.

Planning

To perform manual cost planning, SAP system contains different planner profiles for the various planning areas. In planner profile, you can collect planning layouts grouped according to various criteria.

Step 2 − To perform planning and to create planner profiles in SAP system, navigate to SPRO → IMG → Controlpng → Cost Center Accounting → Planning → Manual Planning → Define User Defined Planner Profiles

Defined Planner Profile

Step 3 − To create a new profile, cpck New Entries. To copy an existing profile, cpck the Copy As option.

Planning New Entries

Step 4 − In the next window, you have enter Profile name, Description, and Authorization Group.

Overview Planning

To save the profile, cpck the save button at the top.

Advertisements