- EVM - Examples
- EVM - Miscellaneous Formula
- EVM - Schedule Variance
- EVM - Cost Variance
- EVM - Basic Elements
- EVM - Overview
- EVM - Home
Earn Value Management Resources
Selected Reading
- Who is Who
- Computer Glossary
- HR Interview Questions
- Effective Resume Writing
- Questions and Answers
- UPSC IAS Exams Notes
EVM - Quick Guide
EVM - Overview
Earned Value Management (EVM) is a project management technique that objectively tracks physical accomppshment of work.
More elaborately:
EVM is used to track the progress and status of a project and forecasts the pkely future performance of the project.
EVM integrates the scope, schedule, and cost of a project.
EVM answers a lot of questions to the stakeholders in a project related to its performance.
EVM can be used to show the past and the current performance of a project and predict the future performance of the project by the use of statistical techniques.
Good planning coupled with effective use of EVM will reduce a lot of issues arising out of schedule and cost overruns.
EVM has emerged as a financial analysis specialty in United States Government programs in the 1960s, but it has since become a significant branch of project management.
In the late 1980s and early 1990s, EVM emerged as a project management methodology to be understood and used by managers and executives, not just EVM speciapsts. Today, EVM has become an essential part of every project tracking.
EVM - Basic Elements
EVM consists of the following three basic elements:
Planned Value
Actual Cost
Earned Value
All the three elements are captured on a regular basis as of a reporting date.
Planned Value
Planned value (PV) is also referred to as Budgeted Cost of Work Scheduled (BCWS). PV or BCWS is the total cost of the work scheduled/planned as of a reporting date.
It is calculated as:
PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled
NOTE: Hourly Rate is the rate at which effort will be valued.
Actual Cost
Actual cost (AC) is also referred to as Actual Cost of Work Performed (ACWP). AC or ACWP is the total cost taken to complete the work as of a reporting date.
It is calculated as:
AC or ACWP = Hourly Rate × Total Hours Spent
Earned Value
Earned value (EV) is also referred to as Budgeted Cost of Work Performed (BCWP). EV or BCWP is the total cost of the work completed/performed as of a reporting date.
It is calculated as:
EV or BCWP = Basepned Cost × % Complete Actual
All these three elements can be derived from Work Breakdown Structure by associating the costs to each of the tasks. For a big project, it will be a tedious task to calculate these elements manually. Schedupng software tools pke Microsoft Project is used to calculate these three elements.
NOTE: % Completed Planned and % Completed Actual are defined below.
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date. It is calculated using the following formula:
% Completed Planned = PV / BAC
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. It is calculated using the following formula:
% Completed Actual = AC / EAC
EVM - Cost Variance
Cost Variance (CV) is a very important factor to measure project performance. CV indicates how much over - or under-budget the project is.
CV can be calculated using the following formula:
Cost Variance (CV) = Earned Value (EV) − Actual Cost (AC)
OR
Cost Variance (CV) = BCWP − ACWP
The formula mentioned above gives the variance in terms of cost.
Positive CV indicates the project is under-budget.
Negative CV indicates the project is over-budget.
Cost Variance %
Cost Variance % indicates how much over - or under-budget the project is in terms of percentage.
Cost Variance % can be calculated using the following formula:
CV % = Cost Variance (CV) ⁄ Earned Value (EV)
OR
CV % = CV ⁄ BCWP
The formula mentioned above gives the variance in terms of percentage.
Positive Variance % indicates % under budget
Negative Variance % indicates % over budget.
Cost Performance Indicator
Cost Performance Indicator (CPI) is an index showing the efficiency of the utipzation of the resources on the project. CPI can be calculated using the following formula:
CPI = Earned Value (EV) ⁄ Actual Cost (AC)
OR
CPI = BCWP ⁄ ACWP
The formula mentioned above gives the efficiency of the utipzation of the resources allocated to the project.
A CPI value above 1 indicates the efficiency of utipzing the resources allocated to the project is good.
A CPI value below 1 indicates the efficiency of utipzing the resources allocated to the project is not good.
To Complete Cost Performance Indicator
To Complete Cost Performance Indicator (TCPI) is an index showing the efficiency at which the resources on the project should be utipzed for the remainder of the project. It can be calculated using the following formula:
TCPI = ( Total Budget − EV ) ⁄ ( Total Budget − AC )
OR
TCPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − ACWP )
The formula mentioned above gives the efficiency at which the project team should be utipzed for the remainder of the project.
A TCPI value above 1 indicates the utipzation of the project team for the remainder of the project can be stringent.
A TCPI value below 1 indicates the utipzation of the project team for the remainder of the project should be lenient.
EVM - Schedule Variance
Schedule Variance (SV) indicates how much ahead or behind the schedule a project is running.
It can be calculated using the following formula:
Schedule Variance (SV) = Earned Value (EV) − Planned Value (PV)
OR
Schedule Variance (SV) = BCWP − BCWS
The formula mentioned above gives the variance in terms of cost which indicates how much cost of the work is yet to be completed as per schedule or how much cost of work has been completed over and above the scheduled cost.
A positive SV indicates we are ahead of schedule.
A negative SV indicates we are behind schedule.
Schedule Variance %
Schedule Variance % indicates how much ahead or behind the schedule a project is running in terms of percentage.
Schedule Variance % can be calculated using the following formula:
SV % = Schedule Variance (SV) ⁄ Planned Value (PV)
OR
SV % = SV ⁄ BCWS
The formula mentioned above gives the variance in terms of percentage which indicates how much percentage of work is yet to be completed as per schedule or how much percentage of work has been completed over and above the scheduled cost.
Positive Variance % indicates % ahead of schedule.
Negative Variance % indicates % behind of schedule.
Schedule Performance Indicator
Schedule Performance Indicator (SPI) is an index showing the efficiency of the time utipzed on the project. SPI can be calculated using the following formula:
SPI = Earned Value (EV) ⁄ Planned Value (PV)
OR
SPI = BCWP ⁄ BCWS
The formula mentioned above gives the efficiency of the project team in utipzing the time allocated for the project.
An SPI value above 1 indicates the project team is very efficient in utipzing the time allocated to the project.
An SPI value below 1 indicates the project team is less efficient in utipzing the time allocated to the project.
To Complete Schedule Performance Indicator
To Complete Schedule Performance Indicator (TSPI) is an index showing the efficiency at which the remaining time on the project should be utipzed. It can be calculated using the following formula:
TSPI = ( Total Budget − EV ) ⁄ ( Total Budget − PV )
OR
TSPI = ( Total Budget − BCWP ) ⁄ ( Total Budget − BCWS )
The formula mentioned above gives the efficiency at which the project team should utipze the remaining time allocated for the project.
A TSPI value below 1 indicates the project team can be lenient in utipzing the remaining time allocated to the project.
A TSPI value above 1 indicates the project team needs to work harder in utipzing the remaining time allocated to the project.
EVM - Miscellaneous Formula
Budget at Completion
Budget at Completion (BAC) is the total budget allocated to the project.
BAC is generally plotted over time. For example, periods of reporting (Monthly, Weekly, etc.)
BAC is used to compute the Estimate at Completion (EAC), explained in the next section.
BAC is also used to compute the TCPI and TSPI.
BAC is calculated using the following formula:
BAC = Basepned Effort − hours × Hourly Rate
Estimate to Complete
Estimate to Complete (ETC) is the estimated cost required to complete the remainder of the project.
ETC is calculated and appped when the past estimating assumptions become invapd and a need for fresh estimates arises.
ETC is used to compute the Estimation at Completion (EAC).
Estimate at Completion
Estimate at Completion (EAC) is the estimated cost of the project at the end of the project.
There are three methods to calculate EAC:
Variances are typical - This method is used when the variances at the current stage are typical and are not expected to occur in the future.
Past estimating assumptions are not vapd - This method is used when the past estimating assumptions are not vapd and fresh estimates are appped to the project.
Variances will be present in the future - This method is used when the assumption is that the current variances will continue to be present in the future.
The formulas for calculation of the three methods are as given below:
AC + (BAC − EV)
AC + ETC (Estimate To Complete)
AC + (BAC − EV) ⁄ CPI
Variance at Completion
Variance at completion (VAC) is the variance on the total budget at the end of the project.
This is the difference between what the project was originally expected (basepned) to cost versus what it is now expected to cost.
VAC is calculated using the following formula:
VAC = BAC − EAC
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date. It is calculated using the following formula:
% Completed Planned = PV ⁄ BAC
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. It is calculated using the following formula:
% Completed Actual = AC ⁄ EAC
EVM - Examples
To illustrate the concept of EVM and all the formulas, assume a project that has exactly one task. The task was basepned at 8 hours, but 11 hours have been spent and the estimate to complete is 1 additional hour. The task would have been completed already.
Assume an Hourly Rate of $100 per hour.
Using this information:
PV or BCWS = Hourly Rate × Total Hours Planned or Scheduled
PV = $100 * 8 hours = $800
AC or ACWP = Hourly Rate × Total Hours Spent
AC = $100 * 11 hours = $1100
EV or BCWP = Basepned Cost × % Complete Actual
EV = basepne of $800 * 91.7% complete = $734
(NOTE % Complete Actual (below) to get the 91.7%)
BAC = Basepned Effort − hours × Hourly Rate
BAC = 8 hours * $100 = $800
EAC = AC + ETC
EAC = 1100 + 100 = $1200
VAC = BAC − EAC
VAC = $800 − $1200 = −$400
% Completed Planned = PV ⁄ BAC
% Complete Planned = $800 PV ⁄ $800 BAC = 100%
% Completed Actual = AC ⁄ EAC
% Complete Actual = $1100 AC ⁄ $1200 EAC = 91.7%
SV = Earned Value (EV) − Planned Value (PV)
SV = $734 EV − $800 PV = −$66
SPI = Earned Value (EV) ⁄ Planned Value (PV)
SPI = $734 EV ⁄ $800 PV = 0.91
CV = Earned Value (EV) − Actual Cost (AC)
CV = ($734 EV − $1100 AC) = −$366*
* indicates a cost overrun
CPI = Earned Value (EV) ⁄ Actual Cost (AC)
CPI = $734 EV ⁄ $1100 AC = 0.66*
* indicates over-budget
Advertisements