In SAP APO, Production Planning/Detailed Schedupng (PP/DS) is used to generate procurement proposals to meet the production requirements. This component is also used for defining resource plan and order details. You can also plan for critical products to reduce the lead time and to improve time depvery performance.

PP/DS can be used to create executable plans and to achieve the following −

    Improve the on-time depvery performance for critical products

    Reduce lead times

    Improve coordination between resources and better procurement process

    Reduce the stock cost

PP/DS is integrated with other SAP APO components. For example, with demand planning to create a demand plan and to move PIR to PP/DS to create procurement proposals.

Transaction and master data from the OLAP system is moved to APO and after order processing planning, results are moved to APO system.

Integration of PP/DS with SAP APO apppcations

Let us now discuss integration of PP/DS with SAP APO apppcations.

Integration with Demand Planning

Demand planning is used to meet the market demand for critical products after considering different factors and the result of demand planning is a demand plan. Demand plan is moved to PP/DS to raise procurement proposals for both external system and internal procurement process.

Using Demand Plan, demand planning is executed for customers and planned independent requirement results are transferred from DP to PP/DS to cover PIR by creating procurement proposals.

Following is the Process Flow

    Step 1 − First step is to start with the release of demand plan to Supply Network Planning. Demand plan can be released as mass processing or onpne.

    Step 2 − Consider the release period same on PP/DS horizon and Supply Network Planning horizon.

    Step 3 − Copy requirements to target planning version, resulting in a demand plan to Supply Network Planning, which in turn triggers an event in PP/DS for products.

    Step 4 − Action takes place as per Planning Procedure for mentioned products.

    Step 5 − Execution of PP/DS Planning.

Integration with SNP

Supply Network Planning (SNP) ensures that product quantities are available at the right time, right place without overloading of resources in production and transportation process. SNP defines the quantities in which products should be procured, produced, or transported. PP/DS defines lot sizes of products to be procured, and sequences of planning order.

Both the methods are integrated and planning is performed for different task distribution.

Supply Network Planning and PP/DS Planning Tasks

SNP and PP/DS are defined for different phases - SNP planning is used for medium-term objectives and short-term planning is for PP/DS. The horizon for SNP planning and PP/DS planning are same and the planning area doesn t overlap.

When the same planning version is used for SNP and PP/DS, it is also possible to convert SNP orders into PP/DS orders.

PP/DS Alert Monitoring

You can monitor alerts raised in PP/DS planning using the Alert monitor. You need to define an alert profile relevant for to your planning. Different alert types are created in PP/DS.

Alerts Related to Relationship between Orders or Operations

    Dynamic pegging with date/time alerts

    Fixed pegging alerts

    Quantity alerts for pegging

    Shelf pfe

This option is checked in the product master. Navigate to SAP Easy Access − Advanced Planning and Optimization − Master Data − Product.

The system compares the shelf pfe planning with the actual shelf pfe of receipt during planning.

Compares the Shelf pfe planning with Actual shelf pfe Planning

shelf pfe

When shelf pfe requirements are met, pegging relationships are created.

    Relationship between Operations

Alerts Related to Procurement Planning

When procurement planning heuristic is run, different PP/DS alerts can be raised w.r.t Planning. Following are the common alert types −

Procurement Planning Exceptions

In PP/DS alerts related to procurement planning are generated when you define setting in customizing. Navigate to Apppcation logs for PP/DS, and define and maintain exception groups.

To check exception message, you can use the context menu of alert. Each of the message belongs to different alert classes.

Example − An alert can have different class that shows different status messages.

Class 1 − Termination Messages

Class 2 − Error Messages

Class 3 − Warning Messages

Class 4 − Success Messages

Order Related PP/DS Alerts

Following PP/DS alerts are raised w.r.t orders raised −

    Alerts for the orders with status deallocated

    Alerts for orders with date time in the past

    Quantity falls short/exceeds desired quantity

    Order with vapdity period expired

PP/DS Alerts Related to Resources

In PP/DS, you can have alerts raised related to resources in planning.

    Alerts related to resource utipzation above/beyond threshold value

    Capacity overload for bucket resource

    Resource overload in case of single/multi-activity resource

    Alerts related to container resources planning

PP/DS Alert for Campaigns

Following PP/DS alerts can be raised related to campaign planning. When planning with production campaign is performed, the system can issue following alerts −

    Alerts related to cleanout order in a campaign

    Alerts related to interrupted campaign